How long to get grid power in any US county. 39,173 filings, 1,574 counties, dated sources.
Watt Street — US grid, interconnection queue and data center power is an MCP server entry in ChatHome Skills, sourced from Official MCP Registry and scored 93/100. As a Model Context Protocol server, it exposes tools that MCP-compatible LLM clients such as Claude, Cursor, and Copilot can call directly, extending an agent's reach beyond its built-in capabilities. ChatHome Skills discovered this entry through its daily ingest of official registries and GitHub discovery queries, and re-verifies repository facts, freshness signals, and install metadata on every run. The quality score weighs official-registry presence, a working install command, license clarity, GitHub star trajectory, and repository freshness — the full formula is on the Sources page. The install command above is ready to copy. Review the last-pushed date and repository status before adding Watt Street — US grid, interconnection queue and data center power to a production agent workflow; the snapshot facts below are point-in-time values from the most recent ingest.
mcp add net.wattstreet/grid https://api.wattstreet.net/mcpReview the upstream source before running this command.
{
"_meta": {
"io.modelcontextprotocol.registry/official": {
"status": "active",
"isLatest": true,
"updatedAt": "2026-09-08T17:33:24.485355Z",
"publishedAt": "2026-09-08T17:33:24.485355Z",
"statusChangedAt": "2026-09-08T17:33:24.485355Z"
}
},
"server": {
"name": "net.wattstreet/grid",
"title": "Watt Street — US grid, interconnection queue and data center power",
"$schema": "https://static.modelcontextprotocol.io/schemas/2025-12-11/server.schema.json",
"remotes": [
{
"url": "https://api.wattstreet.net/mcp",
"type": "streamable-http"
}
],
"version": "1.2.0",
"websiteUrl": "https://wattstreet.net",
"description": "How long to get grid power in any US county. 39,173 filings, 1,574 counties, dated sources."
}
}